The Relaunch

Geographic scope: major highways and toll gates nationwide, prioritised by crash frequency and
distance from existing hospital emergency services.

The Problem: Why This Matters Now​

Road traffic crashes remain one of the leading causes of preventable death in Nigeria. According to the Federal Road Safety Corps (FRSC), Nigeria recorded 10,446 road crashes and 5,289 deaths in 2025 alone, with over 33,000 people injured — a rise in total crashes even in a year where fatalities dipped slightly. Independent analysis has placed Nigeria’s true annual road-death toll considerably higher than official figures capture, and has estimated the survival rate for road accident victims in Nigeria at only around half.

The pattern behind these numbers is consistent: delayed emergency response, an absence of equipped ambulances along major highways, and low public knowledge of basic first aid. These are
precisely the gaps SGAF was built to close — and precisely where a relaunched, well-funded SGAF can make a measurable difference

97962776 052c 4ea1 983c 1be08ee492a4

The Relaunch: What We Are Building

Geographic scope: major highways and toll gates nationwide, prioritised by crash frequency and distance from existing hospital emergency services

st george 5

Ambulance Fleet

Procurement of a fleet of fully-equipped ambulances (Basic and Advanced Life Support configurations) to be stationed at strategic highway points and dispatched to accident scenes.

16e5fb46 7c96 4942 a9dc 7336c26a7874

Emergency Ambulance Rescue Centres (EMARC)

Small, staffed rescue posts at major toll gates and high-crash corridors, each combining an
ambulance bay, basic trauma stabilisation equipment, and a rest/dispatch point for crew, modelled
on SGAF’s original 2003 aims and objectives.

st george 6

Public First Aid & Driver Training

Recurring first-aid training workshops for the general public, commercial drivers, and transport
unions (building on SGAF’s prior collaboration with the Nigerian Red Cross Society and its historical
target audiences, RTEAN and NURTW), plus training and certification for SGAF’s own ambulance and
rescue crews.

st george 7

Blood Bank & Screening Support

Pilot blood bank and screening centres to ensure accident and emergency victims have faster access to safe blood.

The Ask: ₦12 Billion Campaign

We are seeking ₦12,000,000,000 (twelve billion naira) to fund a phased, three-year relaunch of
SGAF’s ambulance and rescue operations. This is a scoping estimate intended to be refined jointly
with government and institutional partners as procurement and site details are finalised — not a
fixed, non-negotiable figure

ItemDetailAmount (₦)
Ambulance Fleet60 fully-equipped BLS/ALS ambulances at an average
of ₦100 million each, inclusive of import duties and
medical fit-out
6,000,000,000
EMARC Rescue Centres 20 Emergency Ambulance Rescue Centres at major
toll gates/highway corridors — construction,
equipment, generators, staff quarters
3,000,000,000
First Aid & Driver
Training
Recurring public and driver training workshops over 3
years, incl. materials, trainers, and venues, with the
Nigerian Red Cross Society
1,000,000,000
Crew Recruitment &
Certification
Recruitment, training, and certification of paramedics
and rescue crew for the fleet and EMARC posts
800,000,000
Blood Bank & Screening 2 pilot blood bank/screening centres and mobile
screening units
500,000,000
Monitoring, Evaluation &
Administration
3-year programme office, M&E systems, independent
financial audit
500,000,000
Contingency (~2%)Cost overruns, currency fluctuation, emergency
reserve
200,000,000
TOTAL ₦12,000,000,000

Figures are planning estimates based on 2026 Nigerian market pricing for fully-equipped ambulances (approx.
₦80–180 million per unit depending on specification) and will be finalised with formal vendor quotations
before funds are drawn down

Ways to Partner With Us

Individuals & Diaspora

Sponsor a specific, tangible item — a first-aid kit, a training slot, a share of an ambulance — with
clear reporting on what was funded.

Nigerian Government (Federal & State)

Co-funding or in-kind partnership for EMARC sites on federal and state highways, aligned with FRSC
and NEMA’s existing road-safety mandates.

International Organisations & Foundations

Full programme partnership aligned to SDG 3 (Good Health and Well-Being), with formal M&E
reporting, independent audit, and multi-year grant structuring.

Official Account Details

Donations may be made directly to the Foundation’s official account with Zenith Bank. The account
name must read exactly as shown below — always confirm this before sending any transfer

Account NameSt. George's Ambulance Foundation
BankZenith Bank Plc
Naira Account1216495288
Dollar (USD) Account5071916506
Pounds (GBP) Account5060488115

Transfers of ₦1,000,000 (or currency equivalent) and above may require internet banking confirmation or a confirmation letter to the bank — for these, please contact us directly so we can guide you through it and issue a formal receipt.

Accountability & Reporting

● All funds will be received into a dedicated bank account, subject to SCUML compliancereporting.
● Quarterly financial and programme reports will be issued to all institutional donors.
● An independent external audit will be conducted annually for the duration of the campaign.
● Every ambulance, EMARC site, and training cohort funded will be individually trackable backto its funding source.

Implementation Timeline (3-Year Phased Rollout)

Funds will be drawn down in three phases, each tied to specific, verifiable deliverables — not released as a single lump sum.

PhaseKey Deliverables Budget Share
Year 1 Mobilisation & PilotBoard reconstitution and governance refresh; independent
opening audit; procurement of first 15 ambulances; 5 pilot
EMARC sites; training curriculum refresh with the Red Cross
and first training cohort; M&E system set up
₦4,800,000,000 (40%)
Year 2 Scale-Up 25 additional ambulances; 10 additional EMARC sites;
expanded recurring training programme; first pilot blood
bank/screening centre; first independent annual audit
₦4,200,000,000 (35%)
Year 3
Consolidation
Remaining 20 ambulances; remaining 5 EMARC sites; second
blood bank/screening centre; sustainability and handover
plan; second independent audit
₦3,000,000,000 (25%)

Disbursement into each phase is contingent on the independent audit of the prior phase being signed off.  This structure is designed to give institutional donors confidence and control at every stage.

Expected Impact

The following are planning projections based on the scale of the programme and comparable
emergency-response interventions elsewhere; they will be refined once baseline data is collected in
Year 1, and reported against actual results thereafter.


60

Ambulances deployed nationwide

20

EMARC rescue centres established

3

Years to full rollout

15,000+

Highway corridors with faster
emergency coverage

20+

Highway corridors with faster
emergency coverage

Quarterly

Public reporting cadence

The underlying goal is straightforward: fewer of the roughly 5,000+ Nigerians who die in road
crashes each year should die specifically because help could not reach them in time or because no
one nearby knew what to do in the first minutes.

Partnership & Recognition Opportunities

For donors who wish to fund a specific, named component of the programme rather than the
general campaign:

TierWhat is Funds Recognition
Platinum PartnerA fully-equipped ambulance
(₦100m) or an EMARC rescue
centre (₦150m)
Naming rights on the
vehicle/centre; permanent
recognition in annual reports
Gold Partner A full training cohort or a blood
screening unit (₦25–50m)
Named sponsorship of the
cohort/unit; logo on training
materials
Community Partner A first-aid kit bundle, a single
training slot, or general support
(any amount)
Listed as a supporting partner on
SGAF's donor wall and website

Risk Management

Risk Mitigation
Funding shortfall or delayPhased, milestone-based disbursement so partial
funding still delivers a complete, working pilot
phase rather than a stalled full-scale plan
Procurement / import delays Vendor pre-qualification and quotations obtained
before funds are drawn down for that phase
Governance / leadership transition Formal reappointment of Board Chairman and
reconfirmation of all trustees as a Year 1 milestone,
independent of programme funding
Site security on highway corridors Site selection done in coordination with FRSC and
local security agencies before construction
Currency fluctuation Contingency line item; phased procurement rather
than a single upfront purchase order
Financial mismanagementDedicated bank account, SCUML compliance,
quarterly reporting, and annual independent
external audit
pile organisee documents bureau bien range soleil doux 334364 33771

Supporting Documentation on File

The following original documents are held by SGAF and available for verification by donors, government partners, and international agencies:

Scroll to Top